Back
Similar todos
Load previous page…
#flying : [CPT] Max Crosswind T/O
5. Investigate the PRPO not complete issue for RES-LANCE-202100089-NEO_FSO_v1, even planned out the long and short term solution for this ✅ #enpvqp
#flying : [CPC] Contaminated Runway
- solve the issue with duplicate linkages in ENPVQP #enocpop
add ams-cpt with lh in y #yelmair
#flying : [CPT] Flight Controls
- update the strong assumptions for planned costs ✅ #enpvqp
#flying : [CPT] Hydraulics
#flying : [CPT] LVTO EFATO @ V1
3. rename 3PP for IM to 3PP for IM/PM ✅ #enpvqp
- meeting on planned cost to standardize between pm and finance users ✅ #enpvqp
- setup issue for planned cost ✅ #enpvqp