Back
Similar todos
- break down the [[work.ericsson.eno-products]] into tasks ✅ #enocpop
- plan the next step by drawing up schemas and procedural pseudo code as plans for customer work ✅ #enocpop
- using robocorp to iterate through the list and process each detail po page ✅ #enocpop
#enocpop
- plan the mass create quote task breakdown ✅
break it down to 3 - 5 step process #jobs
breakdown projects into really small steps
- plan out the next two demos and when i can work on them ✅ #enocpop
- analyze and break out separate problem-solution request about using new technology set and postpone to 2023-01-23 #enocpop
#enocpop 🇸🇬📬
- 🐛 follow up on out of memory bug (9/15) ✅
- 👨🏻💻 tie up loose ends for CCB suppression (2/6) => (4/6) ✅
3. plan for the long term fixes of bug ✅ #enocpop
- meeting to clarify how to make the WBS assignment dynamic => 3 dropdowns needed ✅ #enocpop
- day 6 / 10 of testing for out of memory issue ✅ #enocpop
- write a data engineering script that helps with cleaning up the wrong acceptance paper data ✅ #enocpop
- document the various reports and operations that need more memory ⭐️ (Prio for the day) ✅ #enocpop
- find a short term solution for slow retrieval ✅ #enocpop
#enpvqp
- finish all the next steps for [[work.ericsson]] under the 7 major initiatives (7/7) ✅
- plan the SSO task breakdown ✅ #enpvqp
- can push to backend to process results ✅ #enocpop
4. plan the list for revision for this week [[work.icanstudy.things-to-revise]] ✅ #enocpop
- started restart script; broke down to 7 steps; tested 2; implemented 6 ✅ #enpvqp