Back
Similar todos
- finish the download TNM report link ✅ #enpvqp
- add new TNM linkage ✅ #enpvqp
#enpvqp - fix the bugs found for TNM ✅
- follow up on the TNM activity replacement ✅ #enpvqp
2. investigate why TNM got stuck ✅ #enpvqp
- create the TNm report scheduled task ✅ #enpvqp
- deploy new sub project report ✅ #enpvqp
- confirmation test the new s1v5 bot asp report ✅ #enpvqp
- changes to TNM team > 383: AOB short term ✅ #enpvqp
6. diagnose the comma issue for tnm ✅ #enpvqp
- Outline the changes required to allow IM to self-repush TNM ✅ #enpvqp
- follow up on Sunday non appearance of ROD reports ✅ #enpvqp
3. follow up with BOT team abt the multiple uploaded reports ✅ #enpvqp
- add FY22/23 FLIR report ✅ #enpvqp
3. solve the TNM pull from PDB hotfix that was discovered today ✅ #enpvqp
- finish s1v5 for asp report ✅ #enpvqp
- Finish 9/17 of [MTT-598](linear.app/oppoin/issue/MTT-5…) ✅ #enpvqp
10. add the stuck report to show the PFM names ✅ #enpvqp
#enpvqp 🇵🇭📮
- ⭐️ fix the tests in [[IM DIY push TNM (MTT-521)|issues.MTT-521]] (2/5) => (3/5) (allocated: <= 60 mins) ✅
#enpvqp 🇵🇭📮
- ⭐ change the url for PDB production ✅
- ⭐ ensure the fix for the TNM repush tests are all okay ✅
- ⭐ deploy the changes and alter the states for 3PP and TNM where necessary ✅
- follow up on stuck QMWD ✅
- fix data issues for transfer of PDB url ✅