Back
Similar todos
- follow up meeting with miguel ✅ #enpvqp
- solve the issue with duplicate linkages in ENPVQP #enocpop
- Work on backend for linkages that work with TBD sites ⭐️ (top prio of the day) ✅ #enpvqp
- fix the issue of manual switch site as requested by Miguel ✅ #enpvqp
- data linkages for 3PP and RES ✅ #enpvqp
4. the RES linkage ✅ #enpvqp
- Work on frontend for linkages that work with TBD sites ⭐️ (top prio of the day) ✅ #enpvqp
2. briefly study the list of PO from Ellen and upload manaul PO released data ✅ #enpvqp
- answer user question on linkage ✅ #enpvqp
#enpvqp 🇵🇭📮
- follow up on the linkage issue for the yinda vendor from Singapore ✅
- [[ follow up on the stuck QMWD|followup.stuckqmwd]] ✅
- follow up on circleci failed builds ✅
- answer question on linkage ✅
- meet with Joey to find out where she get the info to update the WBS, NN, and Site linkages in VQP ✅ #enpvqp
3. delete 1 house of old linkages ✅ #enpvqp
- weekly update on progress with Miguel ✅ #enpvqp
- fix the missing PO number column ✅ #enpvqp
3. fix the 500 and 1000 dropdown for linkage houses ✅ #enpvqp
Create an issue about how sometimes PO_Released reports are released before PRPO so discuss with Miguel how to do this ✅ #enpvqp
2. follow up with Hector Avena about SSO ✅ #enpvqp
- customer incident with finding NW number in project linkages ✅ #enpvqp
7. investigate and upload the missing po released data ✅ #enpvqp
3. discuss how to solve cancel quotes taht may have a PO assigned but VQP wasn't aware ✅ #enpvqp