Back
Similar todos
7. Write down the cause for the Locked in process and the long term solution approach ✅ #enpvqp
1. checked to see the partial data and locked data long term fix is working ✅ #enpvqp
- design solution approach to solve the stuck on pushing quote ✅ #enpvqp
5. Investigate the PRPO not complete issue for RES-LANCE-202100089-NEO_FSO_v1, even planned out the long and short term solution for this ✅ #enpvqp
Work on the issue-195 for #enpvqp
3. discuss how to solve cancel quotes taht may have a PO assigned but VQP wasn't aware ✅ #enpvqp
- resolve data issue raised by user ✅ #enpvqp
2. make save and continue work ✅ #enpvqp
- fix the missing PO number column ✅ #enpvqp
- solve issue MTT-599 ✅ #enpvqp
- fix the only 1 line showing up in converted vqp ✅ #enpvqp
- fix all the push and failed operational issues ✅ #enpvqp
4. Fix the subproject unable to save bug ✅ #enpvqp
1. solve the bug for the 3PP scope ✅ #enpvqp
fixed issue 201 #enpvqp
- setup issue for planned cost ✅ #enpvqp
- fix the line item display and fix the prefix in vqp.html ✅ #enpvqp
- deploy and test the above fixes ✅ #enpvqp
2. fix the stuck in pdb for res and PSS ✅ #enpvqp
- the not working in vqp project issue ✅ #enpvqp